What must be confirmed first?
The opening location, dimensions, depth, element type, required finish, access and available information on reinforcement or concealed services should be confirmed before a cutting method is selected.
The client, consultant or responsible technical party should identify or approve the opening according to the project and element involved. A photograph alone can support an initial review but is not a complete cutting scope.
Scope checklist
Opening centre, width, height or diameter, level and tolerance.
Wall, slab or beam, expected thickness, access to one or both sides and available technical data.
Occupied areas, adjacent finishes, water collection, dust control and safe handling of the cut section.
Edge condition, piece removal, cleaning and any work explicitly excluded from the scope.
What affects the offer?
- Element type, thickness and available technical information.
- Opening size, number, geometry and accuracy.
- Height, access and working space.
- Water, dust and occupied-area protection.
- Handling and removal of cut pieces.
- Required operating hours and sequencing.
Important limitation
This guide explains how to define a request. It does not approve an opening, classify a structural element or replace project-specific engineering review, scanning, permits or supervision where they are required.
